Open Charging Technology · Whitepapers

Chargy in the Vehicle: Meter Readings, Vehicle-Side Measurement and a Signed Charging Report over ISO 15118

Status: Concept paper, draft for discussion.

Version: 0.1 (2026-11-27)

Point of contact: Achim Friedland, GraphDefined GmbH

Prototype: planned in EVCLI, see Section 11.5.

1. Summary

ISO 15118 carries the charging station's meter readings to the vehicle and lets the vehicle acknowledge them with a signature. Both parts of the standard even reserve a field for the meter's own signature. In practice the chain is complete in none of the five stacks examined: each implements a different half, and the ISO 15118-20 confirmation exists nowhere as a working flow.

The vehicle's receipt is also only an acknowledgement of receipt. The car signs the station's number, not its own measurement. And the driver sees none of it.

This paper therefore proposes Chargy in the Vehicle. Before energy flows, the vehicle compares its clock with the station's and the meter's. During charging it verifies the signed meter readings live and compares them with the measurements of its own battery system, using the meter's digital calibration certificate. At the end it issues its own signed charging report.

Three groups benefit:

The core works without changing the standard, over ISO 15118-20. Three small extensions would turn it into a charging record signed by both sides. The revision of the Measuring Instruments Directive points the same way: it lets the measurement result be made accessible through a device of the end user.

The paper is based on the XSD schemas of the standard, on requirement identifiers, and on the source code of the stacks in our interoperability rig. Normative text is paraphrased, never quoted.

2. ISO 15118-2: MeterInfo out, MeteringReceipt back

In ISO 15118-2 the meter reading rides on the charge-loop response, and the station can demand a signed receipt for it. The sequence:

  1. The station sends an optional MeterInfo in ChargingStatusRes (AC) or CurrentDemandRes (DC).
  2. If it also sets ReceiptRequired = true, the vehicle must send a MeteringReceiptReq next.
  3. The MeteringReceiptReq contains SessionID, SAScheduleTupleID and the station's MeterInfo, echoed unchanged.
  4. The vehicle signs this body with the private key of the contract certificate: XMLDSig in the header, ECDSA P-256 with SHA-256 over the EXI-encoded fragment ([V2G2-903]).
  5. The station answers with MeteringReceiptRes and continues the charge loop.

MeterInfoType has five elements, of which only the first is mandatory:

Element Type Meaning
MeterID string identifier of the meter
MeterReading unsignedLong, Wh meter register
SigMeterReading base64Binary, at most 64 bytes the meter's signature over its reading
MeterStatus short status word of the meter
TMeter long, Unix seconds the meter's timestamp

Three things limit this:

The requirement with teeth is on the outbound side: under [V2G2-902] the MeterInfo must be the unaltered output of the meter. What exactly SigMeterReading signs, the standard does not say.

3. ISO 15118-20: the vehicle may ask, the receipt gets richer

ISO 15118-20 keeps the principle, but partly reverses the initiative and separates the receipt from the charge loop.

ISO 15118-2 ISO 15118-20
Carrier of the reading ChargingStatusRes, CurrentDemandRes AC_/DC_ChargeLoopRes
Who initiates the station only vehicle (MeterInfoRequested) or station
Energy fields one register in Wh charged, discharged (BPT), capacitive and inductive reactive energy
Meter's signature SigMeterReading, at most 64 bytes MeterSignature, at most 64 bytes
Vehicle's receipt MeteringReceiptReq MeteringConfirmationReq with SignedMeteringData
Receipt covers session, tariff tuple, MeterInfo session, MeterInfo, cost receipt, control mode
Signature algorithm ECDSA P-256 / SHA-256 ECDSA P-521 / SHA-512 or Ed448
Trigger ReceiptRequired EVSENotification = MeteringConfirmation

The chain is linked more tightly here than in ISO 15118-2: without MeterInfo there is neither a confirmation nor a kWh-based receipt ([V2G20-1919]). A station that never sets the element has made the whole path unreachable.

Two weaknesses remain. The 64 bytes hold exactly one raw P-256 signature r‖s, which is not even enough for the curves ISO 15118-20 prescribes elsewhere. And here, too, nothing defines what the meter signs.

4. What the stacks actually implement

No third-party stack has the complete chain, and the ISO 15118-20 confirmation exists nowhere as a flow, not in ours either. State of the source trees in our rig on 26 November 2026:

Stack (revision) -2: station sends MeterInfo -2: meter signature -2: vehicle signs receipt -2: station verifies receipt -20: MeterInfo -20: MeteringConfirmation
Ours (WWCP_ISO15118) yes yes, own convention yes yes, verdict logged per receipt yes, AC and DC, with MeterSignature; vehicle can ask codec and signature tests only, no flow
Josev (d645255) no, commented out in the code no yes, if demanded and over TLS yes, aborts on failure yes, if the vehicle asks, unsigned; its own EVCC never asks a TODO and the failure response only
EVerest EvseV2G (2026.02.1, deprecated) yes, 2 of 5 elements no (station only) no, and does not forward it (-2 only) (-2 only)
EVerest C++ stack (2026.10.0, 74845c57) yes no yes, new EV side yes no: the request is read, the response never set omitted, per its own documentation
eVDriveFlow (60249c3, -20 only) (-20 only) (-20 only) (-20 only) (-20 only) no, generated classes only no, classes and a timeout entry only
tux-evse (fc51088, replayer) replays what the scenario dictates no encoders for -2 and DIN exist no logic of its own no -20 part in the JSON interface no

Three observations:

Our own stack already has two building blocks for what follows: SigningMeter on the station side, and EvMeter, a counter of the vehicle's own that is never fed from the station's answer.

5. What today's signature proves, and what it does not

Even fully implemented, the standard's mechanism proves only that a certain contract received a certain record. For transparency in the sense of legal metrology, six things are missing:

  1. The meter's key. 64 bytes hold a signature, but no public key, no serial number and no format identifier. A key supplied by the station itself only shows that nothing changed in transit.
  2. The signed content. Real meters sign a record with start and end register, time, user identification and meter status, for instance as OCMF. MeterInfo contains fragments of that. Without the exact signed bytes the vehicle can verify nothing.
  3. A statement of the vehicle's own. The car echoes the station's number. Its own measurement appears in no message.
  4. The right identity. The signing key is the contract key. It identifies the energy contract, not the vehicle and not its measuring equipment.
  5. EIM sessions. Without Plug & Charge, ISO 15118-2 has no receipt at all.
  6. The human. None of this reaches a display. Transparency software checks an invoice days later, instead of the charging session while it runs.

Point 3 matters most. A signature protects a number from being altered after the measurement. Whether the measurement is right, only a second, independent measurement can show, and the only one that is present at every charging session anyway sits in the car.

6. Chargy in the Vehicle: the concept

Chargy in the Vehicle is the live view of the Chargy web app, except that it runs in the car, takes its data straight from the ISO 15118 session, and puts a second measurement beside the station's. A tool for checking invoices becomes a measuring partner during charging.

6.1 First, compare the clocks

The first thing the vehicle does, before any energy flows, is compare clocks. Every later check rests on it.

Three clocks meet in a session:

Clock Where the vehicle reads it Reference quality
Station controller header TimeStamp of every ISO 15118-20 message, from SessionSetupRes on whatever the station synchronises to
Meter MeterTimestamp (-20) or TMeter (-2), and the timestamp inside the signed record, which in OCMF carries its own synchronisation status the legally relevant one
Vehicle satellite time, or authenticated network time independent of the station

Why this comes first:

The vehicle records the offsets of both station clocks at the start and at the end of the session. The difference is the drift, and the two station clocks disagreeing with each other is a finding of its own. All of it goes into the charging report.

ISO 15118-2 has no header timestamp. There the meter's TMeter is the only clock the vehicle sees, and only once a MeterInfo arrives.

How the station should obtain legally defensible time is the subject of two companion papers: Secure Time Synchronization for OCPP and Critical Legal Time Services.

6.2 Building blocks

Block Task Exists
V2G tap takes MeterInfo, meter signature, timestamps, tariff and receipt from the EVCC; sets MeterInfoRequested in the stack: Evcc20Base.RequestMeterInfo
Clock comparison offsets of station and meter clock against the vehicle's reference new
Transparency record key, serial number, signed raw data and calibration certificate of the meter missing, see implementation
Verification core verifies the meters' signature formats ChargyCore.TS
Vehicle measurement reads current, voltage, state of charge and auxiliary consumption from the battery system in the simulator: EvMeter; in a real car through the vehicle interface
Comparator loss model, uncertainty budget, deviation detection new
Report signer produces and signs the charging report new

6.3 Three runtime environments, one core

6.4 What the driver sees

6.5 The verification chain

Every step has a result of its own. A green tick on step 2 says nothing about step 6.

  1. Clocks agree? Station, meter and vehicle time are within tolerance, and the offsets are recorded.
  2. Signature valid? The record has not been altered since the meter.
  3. Key trustworthy? The key comes from a source outside the station: a register, a certificate or a calibration certificate.
  4. Belongs to this session? SessionID, EVSE ID, contract and time match.
  5. Gapless? The register never falls, never jumps, and the start value precedes the first current.
  6. Plausible against the vehicle? The difference lies within loss model and uncertainty.
  7. Price correct? Quantity times tariff gives the station's receipt.

An unsigned value is a state of its own, and an honest one, not a fault. Almost every station in the field sends that, and the comparison in step 6 works regardless.

7. Bidirectional charging: the driver becomes the seller

With bidirectional charging the driver has a direct financial interest in a second measurement, because the roles reverse. When the vehicle feeds energy back, the driver is the seller, and is paid according to a meter that belongs to the buyer.

In no other market does the seller accept that without a measurement of their own. Here the stakes are higher than usual, for four reasons:

ISO 15118-20 already separates the directions: MeterInfo has ChargedEnergyReadingWh and BPT_DischargedEnergyReadingWh, plus reactive energy in both directions. The vehicle's battery system counts both directions as well, because it needs to for state-of-charge estimation.

So Chargy in the Vehicle treats a bidirectional session as two measurements with opposite roles. The charging report states both directions separately, each with its own comparison, and for the discharge direction it is the seller's delivery note. A vehicle owner who sells energy without one is trusting the customer's scale.

8. Comparing against the battery system

Station and vehicle measure the same energy at different places. The difference is therefore never zero, but it can be explained: losses, auxiliary consumption and measurement uncertainty. Whatever goes beyond that is the finding.

 Station's measuring point                Vehicle's measuring points
            |                              |                               |
            v                              v                               v
   +----------------+   +--------+   +-----------+   +--------------+   +----------------+
   | Station meter  |-->| Cable  |-->|   Inlet   |-->|   Charger    |-->| Battery sensor |
   | with signature |   | plus   |   |    own    |   | on board, AC |   |    measured    |
   |                |   | conn.  |   |  measure- |   |              |   |     by BMS     |
   +----------------+   +--------+   |   ment    |   +------+-------+   +----------------+
                                     +-----------+          |
                                                            v
                                                   +-----------------+
                                                   | Auxiliary loads |
                                                   | cooling, 12 V   |
                                                   +-----------------+

Measurement chain: three measuring points, two parties.

Between the station's meter and the sensor at the battery lie the cable, for AC the on-board charger, and the branch to the auxiliary loads. The closer the vehicle's measuring point is to the inlet, the less the loss model has to explain.

8.1 The balance

E_{\mathrm{station}} = E_{\mathrm{battery}} + E_{\mathrm{aux}} + E_{\mathrm{loss}} + \varepsilon
Quantity How the vehicle knows it Documented magnitude
Energy into the battery pack voltage times pack current, integrated by the BMS shunt sensor: ±0.4 % of reading plus offset over the full temperature range (Isabellenhütte IVT-S)
Auxiliary consumption power of compressor, heater and 12 V converter from the vehicle network no citable measurement found; has to be measured per vehicle
On-board charger (AC only) the charger's input measurement, or an efficiency map 90.8 % at 240 V, 88.8 % at 120 V, charging station included (INL, Chevrolet Volt)
Cable and connector voltage drop between station and inlet, times current at most 0.5 % between meter and transfer point, otherwise compensation is required (Bender)
Station meter accuracy class or calibration certificate maximum permissible errors for class A / B / C: 3.5 / 2 / 1 % at 5 to 30 °C (MID, Annex V); Germany requires at least class A (REA 6-A)

Two conclusions follow. The station's meter may be less accurate than the vehicle's current sensor: a class A station has an error limit of up to 3.5 %, a good shunt 0.4 %. And the largest unknown is the auxiliary consumption, for which no reliable figures exist.

The revision of the Measuring Instruments Directive introduces dedicated classes for charging equipment with ±2 / ±1 / ±0.5 %, determined at the transfer point, for AC and DC (Council document 6233/2026). From version 1.2 on, OCMF can sign the cable resistance used for compensation. The vehicle can check it against its own voltage drop.

Per charging mode, the vehicle uses the measuring point that is closest to the station and belongs to itself. For DC that is voltage and current at the inlet, with only the cable in between. For AC it is the input measurement of the on-board charger. If neither exists, it calculates backwards from the battery. No value may come from an answer of the station, or one compares a number with itself.

8.2 The digital calibration certificate

The Digital Calibration Certificate (DCC) is PTB's machine-readable XML format for calibration results. For Chargy in the Vehicle it does four things:

Two caveats belong here. The DCC schema 3.3.0 has no dedicated field for a device key. The fingerprint would have to go into the generic identifications of the item, and the certificate's signature is the issuer's. And for billing meters the governing document is not the calibration certificate but the conformity assessment. Its digital counterpart is PTB's D-CoC, which is still under development and so far mainly covers type-examination certificates. We found no work specific to electricity or charging meters.

Conversely, the vehicle's current sensor can receive a calibration certificate at the end of the production line. Then two traceable measurements face each other.

8.3 Decision rule

\left| E_{\mathrm{station}} - \hat{E}_{\mathrm{station}} \right| \le k \sqrt{u_{\mathrm{meter}}^2 + u_{\mathrm{vehicle}}^2 + u_{\mathrm{model}}^2}

Here Ê is the vehicle's estimate of the station's value, and k = 2 the usual coverage factor. Inside the band the session is unremarkable, between k = 2 and k = 3 conspicuous, beyond that a deviation. The rule is evaluated continuously per sample and cumulatively, so that a slow drift shows as clearly as a jump.

8.4 Error patterns

Pattern of the deviation Probable cause
Fixed factor at every power scaling: transformer ratio or wrong cable-loss compensation
Fixed amount in watts unmodelled auxiliary load, or the station's own consumption behind the meter
Factor near one third or two thirds (AC) one phase is missing from the measurement
Grows with the square of the current contact resistance at the connector, which is also a safety finding
Jump in the register foreign session, register change or manipulation
Energy before the first or after the last current start or end value wrongly assigned
Same curve, shifted in time clock or averaging window, already caught in step 1

8.5 The honest limit

The vehicle's sensor is not a legally verified measuring instrument. A deviation is therefore a well-founded indication that justifies an official inspection, not proof. A single session says little; many sessions at the same station say a lot. Section 10 builds on that.

9. The vehicle's charging report

At the end the vehicle issues a report of its own and signs it. It is the counterpart of the station's receipt: the same session, seen by the recipient, or for discharged energy by the supplier.

9.1 Content

Part Content Why
Session SessionID, EVSE ID, protocol, start, end, charging mode identifies what the report is about
Clocks offsets of station and meter clock at start and end, and the vehicle's time reference the basis of every timestamp below
Station's evidence every signed meter record in the original, byte for byte, plus tariff and cost receipt third parties can verify for themselves
Trust sources the meter's key, where it came from, hash of the calibration certificate makes step 3 traceable
Vehicle measurement energy per measuring point and per direction, the sample series or its hash root, the sensor and its uncertainty the vehicle's own statement
Comparison loss model, uncertainty budget, deviation, result per verification step the verdict and how it was reached
Provenance version and hash of the verification software, identifier of the vehicle or a pseudonym who is judging here

9.2 Format

The report is a JSON-LD document. Our stack already generates JSON-LD from the schemas, and Chargy reads JSON. The signature covers a canonical form, so that it survives reformatting. The report should also be exportable in the Chargy transparency format, so that existing transparency software can open it.

The sample series is attached as a hash tree. The driver can then disclose individual minutes to the operator without handing over the whole charging profile.

9.3 What the vehicle signs with

Key For Against
Contract certificate present in every Plug & Charge session; the station knows the chain identifies the contract, not the vehicle; absent with EIM; changes with the provider
OEM provisioning certificate identifies the vehicle, issued by the manufacturer meant for another purpose; makes every report traceable
A dedicated measurement certificate under the OEM CA says exactly the right thing: this vehicle, this measuring equipment, optionally with a calibration certificate does not exist yet

Recommendation: a dedicated measurement certificate, with rotating pseudonyms for privacy and the key in the vehicle's security module. For the prototype the contract key is enough, because it is already there.

9.4 Signed by both sides

The strongest report carries two signatures. The vehicle signs its report, and the station acknowledges its hash, just as the vehicle today acknowledges the station's meter reading. Afterwards neither side can claim not to have known the other's view. This is the standard's MeteringConfirmation, mirrored in the opposite direction.

10. For metrology authorities: market surveillance by vehicle

Vehicles that report can tell a metrology authority which stations to inspect, and a vehicle with a calibrated reference meter can do the inspection without a test load. The two ideas need each other: the fleet finds where to look, the verification-office car goes there and measures.

10.1 The gap today

A charging station is assessed when it is placed on the market and re-verified at fixed intervals or after a complaint. In between, nobody measures. Complaints are rare, because customers have no measurement of their own to complain with. And testing a DC station on site means bringing a reference meter and a load that can absorb the station's power.

10.2 The fleet as a travelling standard

In an interlaboratory comparison, one artefact travels from laboratory to laboratory and reveals how they differ. A vehicle does the same between charging stations, every day, as a by-product of charging.

For session i of vehicle v at station s, the vehicle's report gives the ratio of the station's reading to the vehicle's own estimate:

\ln \frac{E_{\mathrm{station},i}}{\hat{E}_{\mathrm{vehicle},i}} = b_s - b_v + \varepsilon_i

Here b_s is the systematic relative error of the station, b_v that of the vehicle including its loss model, and ε the noise of one session. One session cannot separate the three. Many sessions form a network of stations and vehicles, and a least-squares fit over the network yields every b_s and every b_v with an uncertainty.

Two properties decide what this is worth:

What an authority gets from it:

Output What it shows
Bias per station, with uncertainty where to send an inspector first: risk-based instead of calendar-based surveillance
Error curve over power, temperature and charging mode a station that is within limits at 20 °C and outside them in winter
Drift over months ageing between two verifications
Common bias of one model or firmware version a type defect, such as a wrong cable-loss compensation, visible after weeks instead of after a complaint
Step change at one station on one day a repair, a meter swap or a manipulation
Clock offsets per station surveillance of the time base behind time-of-use tariffs

Three design points:

The legal weight is that of an indication. A flagged station is a reason for an official inspection, not a substitute for one. Reports are signed by the vehicles, so whoever aggregates them, an authority or a neutral body, does not have to be trusted for their authenticity.

10.3 The verification-office car as test equipment

A vehicle that carries a calibrated reference meter directly behind its inlet, traceable and with a digital calibration certificate, is a test instrument for charging stations. It has properties no test bench has:

The reference meter has to be clearly better than the limit under test, by a factor that verification rules prescribe. Against error limits of 1 to 3.5 % that is available technology.

The limits are practical ones:

A path in three stages:

  1. Software only. EVCLI against ChargingStationCLI, with simulated meters and switchable faults. This shows the protocol, the report and the evaluation.
  2. Test bench. EVCLI drives real charging hardware as a vehicle emulator, with a real station meter and a reference meter. This shows the measurement.
  3. A real vehicle. A car with a sealed reference meter, as a pilot with a verification authority.

10.4 How the two fit together

The verification-office cars are the anchors that fix the fleet's free constant, and the fleet tells the cars where to drive. A handful of calibrated vehicles makes thousands of ordinary ones metrologically useful. Other vehicles with calibrated sensors, in a car-sharing or taxi fleet for instance, can serve as additional anchors without ever being sent anywhere on purpose.

11. Implementation in ISO 15118

The path has three stages. The first works today, the second is schema-valid without changing the standard, the third consists of three small extensions to the standard.

11.1 Stage 0: with what the standard already has

The limit is the 64 bytes. OCMF signs with ECDSA on secp256r1 by default and defines DER as the only encoding. Such a signature has 70 to 72 bytes and does not fit. It converts losslessly into the raw form r‖s and then fits exactly. But the bytes that were signed are still missing.

11.2 Stage 1: schema-valid carriers in ISO 15118-20

A private value-added service (VAS) for the master data. The station offers a service of its own in ServiceDiscoveryRes. ServiceDetailRes returns up to 32 parameters per set, strings up to 80 characters. That is enough for:

Parameter Size Fits
Format identifier, such as OCMF a few characters yes
Serial number of the meter under 32 characters yes
Public key P-256, compressed 33 bytes, 44 characters base64 yes
SHA-256 of the calibration certificate 64 hex characters yes
Short URL for the rest up to 80 characters yes
Signed meter record, calibration certificate kilobytes no

The Internet service for everything large. ISO 15118-20 knows an Internet value-added service through which the vehicle speaks HTTP over the charging link. Over it the station serves three paths:

Call Returns
GET /.well-known/chargy/meter key, serial number, calibration certificate
GET /.well-known/chargy/sessions/{SessionID}/records the signed meter records of the running session
POST /.well-known/chargy/sessions/{SessionID}/report accepts the charging report, answers with the station's counter-signature

The paths are a proposal of this paper. The charge loop delivers the running number with its 64-byte signature, the HTTP channel the bytes that belong to it. They are matched by MeterID and register value.

The live problem is smaller than expected. Besides begin (B) and end (E), OCMF knows signed intermediate readings during charging (C) and at a tariff change (T), numbered without gaps. According to the specification, begin, end and tariff change are as a rule the legally relevant ones. So the format permits a signed live view. Whether a given meter signs intermediate readings remains to be checked. Where it does not, the view is honestly two-tiered: unsigned intermediate values, bracketed by a signed start and end value.

ISO 15118-2 has the same seams in a smaller size: ServiceDetail with tighter parameters, and an Internet service. The recommendation remains to start with ISO 15118-20.

11.3 Stage 2: three extensions to the standard

  1. MeterInfo gets the whole record. An optional element for signed meter data as bytes, with signing method, encoding and key. Its shape should match OCPP's SignedMeterValue, so that the station hands the same record unchanged to car and backend.
  2. The vehicle reports its measurement. An optional EVMeterInfo in the ChargeLoopReq: energy at the inlet and into the battery, per direction. Today only ISO 15118-20 AC states any power of the vehicle's own at all (EVPresentActivePower); DC states only the voltage.
  3. The receipt covers both views. SignedMeteringData takes EVMeterInfo and the hash of the charging report, and MeteringConfirmationRes carries the station's counter-signature. "Received" becomes "received X, measured Y myself, and both know it".

Two clarifications belong with them: what MeterSignature signs, and a length limit that fits the curves of ISO 15118-20.

The way there leads through the standard's working group, or first through an open VAS convention. A running implementation with interoperability evidence is the best argument for it.

11.4 Behind the station

The report is only useful if it reaches the operator. For the station's meter values the path exists: OCPP has SignedMeterValue (in 2.1 up to 32,768 characters, signing method and key optional), and the OCPI CDR carries signed_data with values of nature Start, End and Intermediate.

For the vehicle's receipt or report there is nothing. The JSON schemas of OCPP 1.6, 2.0.1 and 2.1 contain no field for MeteringReceipt, MeteringConfirmation or a signature of the vehicle. What remains is DataTransfer and customData. The prose part of the specification was not checked. So today the car's signature ends at the station at the latest, even if the station verifies it.

11.5 The prototype: EVCLI

The prototype is built in EVCLI, our simulated electric vehicle with a web interface and a prompt. Its counterpart, ChargingStationCLI, plays the station. Both use the same ISO 15118 stack, WWCP_ISO15118, as a library.

Where What
WWCP_ISO15118 (stack) MeteringConfirmation as a real flow on both sides, where today there are only codec and signature tests; the transparency VAS; SigningMeter emitting real OCMF records beside the simulator convention
ChargingStationCLI (station) the signing meter with switchable faults: scaling error, missing phase, register jump, wrong clock; the three HTTP paths over the Internet service
EVCLI (vehicle) clock comparison at session start; EvMeter as the vehicle's own measurement; comparator with loss model and uncertainty band; report signer; a Transparency page beside Charging and Logs that shows the two counters, the band and the verification chain live

EVCLI already logs every request and every answer while it happens. The transparency page is a second view on the same event stream, not a second data path.

Order of work:

  1. Clock comparison and the two counters in EVCLI, against ChargingStationCLI with an unsigned meter. No signature is needed yet, and step 6 already works.
  2. MeteringConfirmation in the stack, with a loopback test and a recorded session.
  3. OCMF from the signing meter, the VAS and the HTTP paths; ChargyCore.TS verifies in the EVCLI web interface.
  4. Fault switches in the station and the comparator's verdicts against them.
  5. The signed charging report, and its export in the Chargy format.
  6. Interoperability against EVerest, once its ISO 15118-20 module sets MeterInfo.

12. Further ideas

Sorted by usefulness, the obvious ones first.

13. Open questions and next steps

13.1 Open questions

13.2 Next steps

14. Sources

Own material:

Read on the web on 26 November 2026: